Goodison Park - Everton FC
We dug scansion bases for 2 Disabled lift shafts with 140m2 of concrete being poured into them, we also poured 2 concrete floors on raised levels at the top of the shafts.
We dug scansion bases for 2 Disabled lift shafts with 140m2 of concrete being poured into them, we also poured 2 concrete floors on raised levels at the top of the shafts.